Rose Lake Dam
Key Takeaway
Rose Lake Dam is classified as low hazard in Georgia. Its primary use is recreation.
Physical Details
| Dam Height | 27 ft (taller than 65.9% in GA) |
| Dam Length | 420 ft |
| Dam Type | Earth |
| Max Storage | 34 acre-ft |
| Normal Storage | 26 acre-ft |
| Surface Area | 3 acres |
| NID ID | GA03863 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Dr. Allmand Rose, Jr.
Private
Nearby Dams
Mctract (Roberts Rd.) Lake Dam
Cobb, GA
Low Hazard 18 ftMctract Lake Dam
Cobb, GA
Low Hazard 24 ftLaura Lake Dam
Cobb, GA
High Hazard 27 ftChastain Meadows Pond Dam
Cobb, GA
Low Hazard 24 ftNoonday Creek WS Str # 16
Cobb, GA
High Hazard 29 ftHaygoode Lake Dam
Cobb, GA
Low Hazard 24 ftMark Avenue Stormwater Structure
Cobb, GA
Low Hazard 20 ftDuncan Lake Dam
Cobb, GA
Unknown 25 ftFrequently Asked Questions
What is the hazard classification of Rose Lake Dam?
Rose Lake Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Rose Lake Dam?
Rose Lake Dam is owned by Dr. Allmand Rose, Jr. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Rose Lake Dam?
Rose Lake Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Rose Lake Dam?
Rose Lake Dam has a dam height of 27 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Rose Lake Dam last inspected?
Rose Lake Dam was last inspected on September 1, 1997. Inspection dates indicate when a formal review occurred, not the results of that inspection.