Rocky Mtn Ps Upper Dam and Fused Overpump Spillway

Heath Creek, Armuchee River· Floyd, Georgia· Built 1995· Earth· 90 ft tall
High Hazard Hydroelectric Private

Key Takeaway

Rocky Mtn Ps Upper Dam and Fused Overpump Spillway is classified as high hazard in Georgia. It was completed in 1995 and is 31 years old. Its primary use is hydroelectric. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.

Physical Details

Dam Height 90 ft (taller than 99.3% in GA)
Dam Length12,895 ft
Dam TypeEarth
Max Storage12.6K acre-ft
Normal Storage10.8K acre-ft
Surface Area210 acres
Drainage Area0 sq mi
Max Discharge13,500 cfs
Year Completed1995 (31 years old)
NID IDGA00838

Safety Information

High Hazard

Loss of human life is likely if the dam fails.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: Yes
Last Inspection: April 26, 2022
State Regulated: No

Ownership

Oglethorpe Power Corporation

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Rocky Mtn Ps Upper Dam and Fused Overpump Spillway?

Rocky Mtn Ps Upper Dam and Fused Overpump Spillway is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Rocky Mtn Ps Upper Dam and Fused Overpump Spillway?

Rocky Mtn Ps Upper Dam and Fused Overpump Spillway is owned by Oglethorpe Power Corporation (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Rocky Mtn Ps Upper Dam and Fused Overpump Spillway built?

Rocky Mtn Ps Upper Dam and Fused Overpump Spillway was completed in 1995, making it 31 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Rocky Mtn Ps Upper Dam and Fused Overpump Spillway?

Rocky Mtn Ps Upper Dam and Fused Overpump Spillway serves the following purposes: Hydroelectric. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Rocky Mtn Ps Upper Dam and Fused Overpump Spillway?

Rocky Mtn Ps Upper Dam and Fused Overpump Spillway has a dam height of 90 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Rocky Mtn Ps Upper Dam and Fused Overpump Spillway last inspected?

Rocky Mtn Ps Upper Dam and Fused Overpump Spillway was last inspected on April 26, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.