Ridgeway Tailings Impdam
Key Takeaway
Ridgeway Tailings Impdam is classified as unknown in South Carolina. Its primary use is other.
Physical Details
| Dam Height | 189 ft (taller than 99.8% in SC) |
| Max Storage | 24.2K acre-ft |
| Normal Storage | 50 acre-ft |
| Surface Area | 270 acres |
| NID ID | SC02325 |
Safety Information
Hazard potential has not been determined.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Not Listed
Nearby Dams
Process Solution Pond Dam
Fairfield, SC
Significant Hazard 25 ftPalmer Pond Dam
Fairfield, SC
Low Hazard 18 ftBrown Pond Dam
Richland, SC
Low Hazard 32 ftFuller Pond Dam
Richland, SC
Significant Hazard 27 ftRaintree Investors Dam
Richland, SC
Low Hazard 17 ftWiedeman Pond Dam
Kershaw, SC
Low Hazard 25 ftCamp Longridge Lake
Fairfield, SC
Low Hazard 31 ftKennedy Dam
Richland, SC
Significant Hazard 28 ftFrequently Asked Questions
What is the hazard classification of Ridgeway Tailings Impdam?
Ridgeway Tailings Impdam is classified as Unknown. Hazard potential has not been determined. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Ridgeway Tailings Impdam?
Ridgeway Tailings Impdam is owned by information not available (Not Listed). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Ridgeway Tailings Impdam?
Ridgeway Tailings Impdam serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Ridgeway Tailings Impdam?
Ridgeway Tailings Impdam has a dam height of 189 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Ridgeway Tailings Impdam last inspected?
Ridgeway Tailings Impdam was last inspected on May 1, 2000. Inspection dates indicate when a formal review occurred, not the results of that inspection.