Redmond Pond Dam
Key Takeaway
Redmond Pond Dam is classified as low hazard in South Carolina. Its primary use is recreation.
Physical Details
| Dam Height | 12 ft (taller than 11% in SC) |
| Max Storage | 133 acre-ft |
| Normal Storage | 43 acre-ft |
| NID ID | SC00581 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
RENDELL C CAMPBELL JR;SALLY W YOUNG
Private
Nearby Dams
Sweetwater Lake Dam
Calhoun, SC
High Hazard 27 ftStaley Pond Dam
Calhoun, SC
Low Hazard 18 ftGressett Pond Dam
Calhoun, SC
High Hazard 17 ftGresette Pond Dam
Orangeburg, SC
Significant Hazard 13 ftStrickland Pond Dam
Orangeburg, SC
Low Hazard 22 ftMarion Campbell Pond Dam
Calhoun, SC
Low Hazard 19 ftGriffith Pond Dam
Calhoun, SC
High Hazard 28 ftA S Smoak Pond Dam
Calhoun, SC
Unknown 20 ftFrequently Asked Questions
What is the hazard classification of Redmond Pond Dam?
Redmond Pond Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Redmond Pond Dam?
Redmond Pond Dam is owned by RENDELL C CAMPBELL JR;SALLY W YOUNG (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Redmond Pond Dam?
Redmond Pond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Redmond Pond Dam?
Redmond Pond Dam has a dam height of 12 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Redmond Pond Dam last inspected?
Redmond Pond Dam was last inspected on March 14, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.