Red Hill Quarry Dam
Key Takeaway
Red Hill Quarry Dam is classified as unknown in Virginia. Its primary use is recreation.
Physical Details
| Dam Height | 49 ft (taller than 92.8% in VA) |
| Dam Length | 690 ft |
| Dam Type | Earth |
| Max Storage | 1.2K acre-ft |
| Normal Storage | 423 acre-ft |
| Surface Area | 39 acres |
| Drainage Area | 1 sq mi |
| NID ID | VA003142 |
Safety Information
Hazard potential has not been determined.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Martin Marietta Aggregates
Private
Nearby Dams
Red Hill Orchard Dam
Albemarle, VA
Unknown 24 ftBlandemar Dam
Albemarle, VA
Unknown 37 ftChopin Dam
Albemarle, VA
Unknown 25 ftSouthern Regional Park Dam
Albemarle, VA
Low Hazard 45 ftRosemont Dam
Albemarle, VA
Unknown 39 ftSamuel Walker Dam
Albemarle, VA
High Hazard 25 ftMountain Valley Dam 4
Albemarle, VA
High Hazard 28 ftScogo Dam
Albemarle, VA
Unknown 24 ftFrequently Asked Questions
What is the hazard classification of Red Hill Quarry Dam?
Red Hill Quarry Dam is classified as Unknown. Hazard potential has not been determined. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Red Hill Quarry Dam?
Red Hill Quarry Dam is owned by Martin Marietta Aggregates (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Red Hill Quarry Dam?
Red Hill Quarry Dam serves the following purposes: Recreation, Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Red Hill Quarry Dam?
Red Hill Quarry Dam has a dam height of 49 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Red Hill Quarry Dam last inspected?
Red Hill Quarry Dam was last inspected on March 17, 2010. Inspection dates indicate when a formal review occurred, not the results of that inspection.