Red Boiling Springs #2
Key Takeaway
Red Boiling Springs #2 is classified as high hazard in Tennessee. It was completed in 1976 and is 50 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Length | 743 ft |
| Dam Type | Earth |
| Max Storage | 350 acre-ft |
| Normal Storage | 51 acre-ft |
| Surface Area | 8 acres |
| Drainage Area | 1 sq mi |
| Year Completed | 1976 (50 years old) |
| NID ID | TN11103 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
CITY OF RED BOILING SPRINGS
Local Government
Nearby Dams
Red Boiling Springs #1
Macon, TN
High HazardRed Boiling Springs #4
Macon, TN
High HazardJennings Creek #16
Macon, TN
Significant HazardJennings Creek #15
Jackson, TN
High HazardJennings Creek #13
Jackson, TN
High HazardJennings Creek #17
Macon, TN
High HazardJennings Creek #10
Jackson, TN
High HazardJennings Creek #18
Jackson, TN
High HazardFrequently Asked Questions
What is the hazard classification of Red Boiling Springs #2?
Red Boiling Springs #2 is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Red Boiling Springs #2?
Red Boiling Springs #2 is owned by CITY OF RED BOILING SPRINGS (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Red Boiling Springs #2 built?
Red Boiling Springs #2 was completed in 1976, making it 50 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Red Boiling Springs #2?
Red Boiling Springs #2 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Red Boiling Springs #2 last inspected?
Red Boiling Springs #2 was last inspected on August 3, 2020. Inspection dates indicate when a formal review occurred, not the results of that inspection.