Rainbow

Missouri River· Cascade, Montana· Built 1910· Other· 44 ft tall
High Hazard Hydroelectric Private

Key Takeaway

Rainbow is classified as high hazard in Montana. It was completed in 1910 and is 116 years old. Its primary use is hydroelectric. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.

Physical Details

Dam Height 44 ft (taller than 95.7% in MT)
Dam Length1,405 ft
Dam TypeOther
Max Storage1.2K acre-ft
Normal Storage1.2K acre-ft
Surface Area126 acres
Drainage Area22,928 sq mi
Max Discharge125,000 cfs
Year Completed1910 (116 years old)
NID IDMT00557

Safety Information

High Hazard

Loss of human life is likely if the dam fails.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: Yes
Last Inspection: August 10, 2022
State Regulated: No

Ownership

NorthWestern Energy

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Rainbow?

Rainbow is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Rainbow?

Rainbow is owned by NorthWestern Energy (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Rainbow built?

Rainbow was completed in 1910, making it 116 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Rainbow?

Rainbow serves the following purposes: Hydroelectric. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Rainbow?

Rainbow has a dam height of 44 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Rainbow last inspected?

Rainbow was last inspected on August 10, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.