R S Jameson Dam
Key Takeaway
R S Jameson Dam is classified as low hazard in South Carolina. Its primary use is recreation.
Physical Details
| Dam Height | 11 ft (taller than 8.3% in SC) |
| Max Storage | 53 acre-ft |
| Normal Storage | 28 acre-ft |
| Surface Area | 9 acres |
| NID ID | SC02445 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
JAMESON BROTHERS LLP
Private
Nearby Dams
Kenny Bates Dam
Orangeburg, SC
High Hazard 16 ftHickory Hill Plan Dam 1
Orangeburg, SC
Low Hazard 15 ftEa Fogles Pond Dam
Orangeburg, SC
High Hazard 24 ftHickory Hill Plan Dam 2
Orangeburg, SC
Low Hazard 13 ftDavid Earl Bates Dam
Orangeburg, SC
Low Hazard 25 ftAimee Smiths Pond Dam
Orangeburg, SC
Unknown 17 ftRp Bonnette Pond Dam
Orangeburg, SC
Low Hazard 18 ftEugene and Michele Miller Dam
Orangeburg, SC
High Hazard 15 ftFrequently Asked Questions
What is the hazard classification of R S Jameson Dam?
R S Jameson Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates R S Jameson Dam?
R S Jameson Dam is owned by JAMESON BROTHERS LLP (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of R S Jameson Dam?
R S Jameson Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is R S Jameson Dam?
R S Jameson Dam has a dam height of 11 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was R S Jameson Dam last inspected?
R S Jameson Dam was last inspected on July 12, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.