Price Lake Dam
Key Takeaway
Price Lake Dam is classified as low hazard in Georgia. Its primary use is recreation.
Physical Details
| Dam Height | 23 ft (taller than 50.8% in GA) |
| Dam Length | 235 ft |
| Dam Type | Earth |
| Max Storage | 114 acre-ft |
| Normal Storage | 39 acre-ft |
| Surface Area | 7 acres |
| Drainage Area | 0 sq mi |
| NID ID | GA06187 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Price, Glora Ann
Private
Nearby Dams
Sibley Millpond Dam
Coweta, GA
High Hazard 26 ftDolliver Lake Dam
Meriwether, GA
Low Hazard 14 ftBell Lake Dam
Coweta, GA
Low Hazard 19 ftRainwater Lake Dam
Coweta, GA
Low Hazard 21 ftM.A.Prowell
Coweta, GA
Low Hazard 28 ftCarlos Camp
Coweta, GA
Low Hazard 19 ftClearwater Lake Dam
Coweta, GA
Low Hazard 15 ftLake Raymond Dam
Coweta, GA
Low Hazard 16 ftFrequently Asked Questions
What is the hazard classification of Price Lake Dam?
Price Lake Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Price Lake Dam?
Price Lake Dam is owned by Price, Glora Ann (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Price Lake Dam?
Price Lake Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Price Lake Dam?
Price Lake Dam has a dam height of 23 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Price Lake Dam last inspected?
Price Lake Dam was last inspected on February 23, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.