Premier Parks Upper Dam 2 is classified as significant hazard in Texas. It was completed in 2009 and is 17 years old. Its primary use is flood risk reduction. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 11 ft (taller than 6.1% in TX) |
| Dam Length | 175 ft |
| Dam Type | Earth |
| Max Storage | 7 acre-ft |
| Normal Storage | 3 acre-ft |
| Surface Area | 1 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 1,046 cfs |
| Year Completed | 2009 (17 years old) |
| NID ID | TX09577 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
JAMES WILLIAMS
Private
Nearby Dams
Premier Parks Lower Dam 1
Gregg, TX
Significant Hazard 13 ftWilliams Lake Dam
Gregg, TX
Low Hazard 15 ftSkelly Lake Dam
Harrison, TX
Significant Hazard 17 ftLake Lomond Dam
Gregg, TX
High Hazard 17 ftJohnston Dam No 1
Harrison, TX
Low Hazard 20 ftR and K Dam
Gregg, TX
High Hazard 21 ftSkipper Lake Dam
Gregg, TX
Significant Hazard 22 ftHunters Creek Dam
Gregg, TX
Low Hazard 8 ftFrequently Asked Questions
What is the hazard classification of Premier Parks Upper Dam 2?
Premier Parks Upper Dam 2 is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Premier Parks Upper Dam 2?
Premier Parks Upper Dam 2 is owned by JAMES WILLIAMS (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Premier Parks Upper Dam 2 built?
Premier Parks Upper Dam 2 was completed in 2009, making it 17 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Premier Parks Upper Dam 2?
Premier Parks Upper Dam 2 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Premier Parks Upper Dam 2?
Premier Parks Upper Dam 2 has a dam height of 11 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Premier Parks Upper Dam 2 last inspected?
Premier Parks Upper Dam 2 was last inspected on December 8, 2021. Inspection dates indicate when a formal review occurred, not the results of that inspection.