Pleasant Hill Dam is classified as high hazard in Ohio. It was completed in 1937 and is 89 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Length | 775 ft |
| Dam Type | Earth |
| Max Storage | 87.7K acre-ft |
| Normal Storage | 13.5K acre-ft |
| Surface Area | 2,600 acres |
| Drainage Area | 197 sq mi |
| Max Discharge | 19,000 cfs |
| Year Completed | 1937 (89 years old) |
| NID ID | OH00001 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
USACE - Huntington District
Federal Government
Nearby Dams
Pleasant Valley Ranch Lake Dam
Richland, OH
Significant Hazard 26 ftSellers Lake Dam
Ashland, OH
Low Hazard 35 ftHutchins Lake Dam
Richland, OH
Low Hazard 18 ftThompson Lake Dam
Ashland, OH
Significant Hazard 16 ftBash Lake Dam
Ashland, OH
Low Hazard 24 ftLake Viering Dam
Knox, OH
High Hazard 47 ftCharles Mill Dam
Ashland, OH
High HazardGrogg Lake Dam
Richland, OH
Low Hazard 17 ftFrequently Asked Questions
What is the hazard classification of Pleasant Hill Dam?
Pleasant Hill Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Pleasant Hill Dam?
Pleasant Hill Dam is owned by USACE - Huntington District (Federal Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Pleasant Hill Dam built?
Pleasant Hill Dam was completed in 1937, making it 89 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Pleasant Hill Dam?
Pleasant Hill Dam serves the following purposes: Flood Risk Reduction, Fish And Wildlife Pond, Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Pleasant Hill Dam last inspected?
Pleasant Hill Dam was last inspected on August 27, 2020. Inspection dates indicate when a formal review occurred, not the results of that inspection.