Placid Lake Dam
Key Takeaway
Placid Lake Dam is classified as low hazard in Virginia. Its primary use is recreation.
Physical Details
| Dam Height | 23 ft (taller than 38.4% in VA) |
| Dam Length | 280 ft |
| Dam Type | Earth |
| Max Storage | 256 acre-ft |
| Drainage Area | 1 sq mi |
| NID ID | VA193006 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Placid Bay Civic Assoc.;Westmoreland County
Local Government
Nearby Dams
Latanes Dam
Westmoreland, VA
Unknown 18 ftMorris Dam
Westmoreland, VA
Unknown 17 ftFlemmer Dam
Westmoreland, VA
Unknown 21 ftThomas Branch Dam
Westmoreland, VA
Unknown 23 ftHorners Dam
Westmoreland, VA
Unknown 18 ftBurns Dam
King George, VA
Unknown 20 ftBaylors Dam
Essex, VA
Unknown 14 ftHuggins Dam 3
Richmond, VA
Unknown 19 ftFrequently Asked Questions
What is the hazard classification of Placid Lake Dam?
Placid Lake Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Placid Lake Dam?
Placid Lake Dam is owned by Placid Bay Civic Assoc.;Westmoreland County (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Placid Lake Dam?
Placid Lake Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Placid Lake Dam?
Placid Lake Dam has a dam height of 23 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Placid Lake Dam last inspected?
Placid Lake Dam was last inspected on August 3, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.