Phoenix Cement Dam #1
Key Takeaway
Phoenix Cement Dam #1 is classified as low hazard in Arizona. It was completed in 1989 and is 37 years old. Its primary use is flood risk reduction.
Physical Details
| Dam Height | 34 ft (taller than 61.6% in AZ) |
| Dam Length | 544 ft |
| Dam Type | Earth |
| Max Storage | 36 acre-ft |
| Normal Storage | 28 acre-ft |
| Surface Area | 3 acres |
| Year Completed | 1989 (37 years old) |
| NID ID | AZ00246 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
PHOENIX CEMENT COMPANY;SALT RIVER PIMA-MARICOPA INDIAN COMMUNITY
Private
Frequently Asked Questions
What is the hazard classification of Phoenix Cement Dam #1?
Phoenix Cement Dam #1 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Phoenix Cement Dam #1?
Phoenix Cement Dam #1 is owned by PHOENIX CEMENT COMPANY;SALT RIVER PIMA-MARICOPA INDIAN COMMUNITY (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Phoenix Cement Dam #1 built?
Phoenix Cement Dam #1 was completed in 1989, making it 37 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Phoenix Cement Dam #1?
Phoenix Cement Dam #1 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Phoenix Cement Dam #1?
Phoenix Cement Dam #1 has a dam height of 34 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Phoenix Cement Dam #1 last inspected?
Phoenix Cement Dam #1 was last inspected on December 14, 2011. Inspection dates indicate when a formal review occurred, not the results of that inspection.