Pete Pond Dam 1
Key Takeaway
Pete Pond Dam 1 is classified as low hazard in South Carolina. Its primary use is recreation.
Physical Details
| Dam Height | 26 ft (taller than 67% in SC) |
| Max Storage | 17 acre-ft |
| Normal Storage | 14 acre-ft |
| NID ID | SC01788 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
GRAN-GRAN A LMTD PARTNERSHIP
Private
Nearby Dams
Pete Pond Dam 2
Greenville, SC
Low Hazard 40 ftDorothy Harrison Dam
Greenville, SC
Low Hazard 20 ftAlbert Taylor Pond Dam 1
Greenville, SC
Low Hazard 20 ftAlbert Taylor Pond Dam 2
Greenville, SC
Low Hazard 31 ftHuff Creek WCD Dam 5b
Greenville, SC
High Hazard 48 ftHuff Creek WCD Dam 3a
Greenville, SC
High Hazard 42 ftHuff Creek WCD Dam 2a
Greenville, SC
High Hazard 42 ftTrollingwood Lake Dam
Greenville, SC
High Hazard 31 ftFrequently Asked Questions
What is the hazard classification of Pete Pond Dam 1?
Pete Pond Dam 1 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Pete Pond Dam 1?
Pete Pond Dam 1 is owned by GRAN-GRAN A LMTD PARTNERSHIP (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Pete Pond Dam 1?
Pete Pond Dam 1 serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Pete Pond Dam 1?
Pete Pond Dam 1 has a dam height of 26 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Pete Pond Dam 1 last inspected?
Pete Pond Dam 1 was last inspected on May 16, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.