Perrow Pond Dam
Key Takeaway
Perrow Pond Dam is classified as low hazard in South Carolina. Its primary use is recreation.
Physical Details
| Dam Height | 15 ft (taller than 23.6% in SC) |
| Max Storage | 51 acre-ft |
| Normal Storage | 39 acre-ft |
| Surface Area | 8 acres |
| NID ID | SC02287 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
SARA B PERROW TRUSTEE
Private
Nearby Dams
Moss Pond Dam
Calhoun, SC
Low Hazard 14 ftMoss Lake Dam
Calhoun, SC
Low Hazard 15 ftWhetstone Pond Dam
Calhoun, SC
High Hazard 17 ftShehane Cabin Dam
Calhoun, SC
Low Hazard 26 ftEdwards Pond Dam
Calhoun, SC
Low Hazard 18 ftHane Big Pond Dam
Calhoun, SC
Low Hazard 24 ftSt Matthews Wastewater Efluent Storage Basin
Calhoun, SC
Low Hazard 14 ftHane Little Pond Dam
Calhoun, SC
Low Hazard 22 ftFrequently Asked Questions
What is the hazard classification of Perrow Pond Dam?
Perrow Pond Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Perrow Pond Dam?
Perrow Pond Dam is owned by SARA B PERROW TRUSTEE (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Perrow Pond Dam?
Perrow Pond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Perrow Pond Dam?
Perrow Pond Dam has a dam height of 15 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Perrow Pond Dam last inspected?
Perrow Pond Dam was last inspected on March 1, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.