Parker Basin #2

COTTONWOOD CREEK· Mesa, Colorado· Built 1889· Earth· 18 ft tall
Low Hazard Irrigation Private

Key Takeaway

Parker Basin #2 is classified as low hazard in Colorado. It was completed in 1889 and is 137 years old. Its primary use is irrigation.

Physical Details

Dam Height 18 ft (taller than 29.2% in CO)
Dam Length145 ft
Dam TypeEarth
Max Storage160 acre-ft
Normal Storage60 acre-ft
Surface Area21 acres
Drainage Area0 sq mi
Max Discharge430 cfs
Year Completed1889 (137 years old)
NID IDCO01961

Safety Information

Low Hazard

No probable loss of human life and low economic/environmental losses expected.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: Yes
Last Inspection: August 9, 2018
State Regulated: Yes
Regulatory Agency: DWR

Ownership

COTTONWOOD RES COMPANY (CURRIER, PRESIDENT, CARLYL

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Parker Basin #2?

Parker Basin #2 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Parker Basin #2?

Parker Basin #2 is owned by COTTONWOOD RES COMPANY (CURRIER, PRESIDENT, CARLYL (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Parker Basin #2 built?

Parker Basin #2 was completed in 1889, making it 137 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Parker Basin #2?

Parker Basin #2 serves the following purposes: Irrigation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Parker Basin #2?

Parker Basin #2 has a dam height of 18 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Parker Basin #2 last inspected?

Parker Basin #2 was last inspected on August 9, 2018. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.