North Trinity Laterals WS SCS Site 5 Dam
Key Takeaway
North Trinity Laterals WS SCS Site 5 Dam is classified as low hazard in Texas. It was completed in 1969 and is 57 years old. Its primary use is flood risk reduction.
Physical Details
| Dam Height | 18 ft (taller than 25.8% in TX) |
| Dam Length | 585 ft |
| Dam Type | Earth |
| Max Storage | 93 acre-ft |
| Normal Storage | 10 acre-ft |
| Surface Area | 0 acres |
| Drainage Area | 0 sq mi |
| Year Completed | 1969 (57 years old) |
| NID ID | TX04702 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
BOIS D ARC ISLAND LEVEE DISTRICT;DALWORTH SWCD
Local Government
Nearby Dams
North Trinity Laterals WS SCS Site 6 Dam
Dallas, TX
Low Hazard 30 ftNorth Trinity Laterals WS SCS Site 4 Dam
Dallas, TX
High Hazard 29 ftNorth Trinity Laterals WS SCS Site 3 Dam
Dallas, TX
Low Hazard 27 ftLake Simonds Dam
Dallas, TX
High Hazard 18 ftLawrence Lake Dam
Dallas, TX
Low Hazard 26 ftThomas Dam
Kaufman, TX
Low Hazard 27 ftUpper East Fk Laterals WS SCS Site 11k Dam
Kaufman, TX
Significant Hazard 34 ftUpper East Fk Laterals WS SCS Site 11 Dam
Kaufman, TX
High Hazard 35 ftFrequently Asked Questions
What is the hazard classification of North Trinity Laterals WS SCS Site 5 Dam?
North Trinity Laterals WS SCS Site 5 Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates North Trinity Laterals WS SCS Site 5 Dam?
North Trinity Laterals WS SCS Site 5 Dam is owned by BOIS D ARC ISLAND LEVEE DISTRICT;DALWORTH SWCD (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was North Trinity Laterals WS SCS Site 5 Dam built?
North Trinity Laterals WS SCS Site 5 Dam was completed in 1969, making it 57 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of North Trinity Laterals WS SCS Site 5 Dam?
North Trinity Laterals WS SCS Site 5 Dam serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is North Trinity Laterals WS SCS Site 5 Dam?
North Trinity Laterals WS SCS Site 5 Dam has a dam height of 18 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was North Trinity Laterals WS SCS Site 5 Dam last inspected?
North Trinity Laterals WS SCS Site 5 Dam was last inspected on July 14, 2003. Inspection dates indicate when a formal review occurred, not the results of that inspection.