TRIBUTARY TO FACTORY CREEK· Athens, Ohio· Built 1953· Earth· 29 ft tall
High Hazard Recreation Private

Key Takeaway

Nesbitt Pond Dam is classified as high hazard in Ohio. It was completed in 1953 and is 73 years old. Its primary use is recreation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.

Physical Details

Dam Height 29 ft (taller than 58% in OH)
Dam Length210 ft
Dam TypeEarth
Max Storage40 acre-ft
Normal Storage32 acre-ft
Surface Area3 acres
Drainage Area0 sq mi
Max Discharge3,420 cfs
Year Completed1953 (73 years old)
NID IDOH00081

Safety Information

High Hazard

Loss of human life is likely if the dam fails.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: No
Last Inspection: June 16, 2022
State Regulated: Yes
Regulatory Agency: Department of Natural Resources

Ownership

Neal J & Sandra L Nesbitt

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Nesbitt Pond Dam?

Nesbitt Pond Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Nesbitt Pond Dam?

Nesbitt Pond Dam is owned by Neal J & Sandra L Nesbitt (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Nesbitt Pond Dam built?

Nesbitt Pond Dam was completed in 1953, making it 73 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Nesbitt Pond Dam?

Nesbitt Pond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Nesbitt Pond Dam?

Nesbitt Pond Dam has a dam height of 29 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Nesbitt Pond Dam last inspected?

Nesbitt Pond Dam was last inspected on June 16, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.