Nelle Gray Pond Dam
Key Takeaway
Nelle Gray Pond Dam is classified as low hazard in Mississippi. Its primary use is recreation.
Physical Details
| Dam Height | 14 ft (taller than 23.7% in MS) |
| Dam Type | Earth |
| Max Storage | 96 acre-ft |
| NID ID | MS01540 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
CHERRY TREE PARK HOMEOWNERS
Private
Nearby Dams
Lakes of Nicholas Number 3 Dam
DeSoto, MS
Unknown 10 ftDudley Bridgeforth Pond
DeSoto, MS
Low Hazard 15 ftMegan Drive Lake Dam
DeSoto, MS
High Hazard 13 ftJ O Bridgeforth Pond Dam
DeSoto, MS
Low Hazard 12 ftLake Worthington Dam
DeSoto, MS
Low Hazard 14 ftAnderson Plant Dam
DeSoto, MS
Low Hazard 25 ftE B Hutchins Pond Dam
DeSoto, MS
Unknown 16 ftBridgetown Subdivision Lake Dam
DeSoto, MS
Low Hazard 14 ftFrequently Asked Questions
What is the hazard classification of Nelle Gray Pond Dam?
Nelle Gray Pond Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Nelle Gray Pond Dam?
Nelle Gray Pond Dam is owned by CHERRY TREE PARK HOMEOWNERS (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Nelle Gray Pond Dam?
Nelle Gray Pond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Nelle Gray Pond Dam?
Nelle Gray Pond Dam has a dam height of 14 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Nelle Gray Pond Dam last inspected?
Nelle Gray Pond Dam was last inspected on December 4, 2014. Inspection dates indicate when a formal review occurred, not the results of that inspection.