Ne Trib Leon River WS SCS Site 11 Dam
Key Takeaway
Ne Trib Leon River WS SCS Site 11 Dam is classified as low hazard in Texas. It was completed in 1964 and is 62 years old. Its primary use is flood risk reduction.
Physical Details
| Dam Height | 46 ft (taller than 90.9% in TX) |
| Dam Length | 1,400 ft |
| Dam Type | Earth |
| Max Storage | 1.4K acre-ft |
| Normal Storage | 90 acre-ft |
| Surface Area | 15 acres |
| Drainage Area | 3 sq mi |
| Year Completed | 1964 (62 years old) |
| NID ID | TX00891 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
ERATH COUNTY;UPPER LEON SWCD
Local Government
Nearby Dams
Ne Trib Leon River WS SCS Site 10 Dam
Erath, TX
Low Hazard 46 ftNe Trib Leon River WS SCS Site 12 Dam
Erath, TX
Low Hazard 47 ftNe Trib Leon River WS SCS Site 9 Dam
Erath, TX
Significant Hazard 40 ftBrooks Lake Dam
Erath, TX
Low Hazard 22 ftNe Trib Leon River WS SCS Site 8 Dam
Erath, TX
Significant Hazard 45 ftGreen Creek WS SCS Site 6 Dam
Erath, TX
High Hazard 31 ftNe Trib Leon River WS SCS Site 13 Dam
Erath, TX
High Hazard 32 ftNe Trib Leon River WS SCS Site 14 Dam
Erath, TX
High Hazard 23 ftFrequently Asked Questions
What is the hazard classification of Ne Trib Leon River WS SCS Site 11 Dam?
Ne Trib Leon River WS SCS Site 11 Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Ne Trib Leon River WS SCS Site 11 Dam?
Ne Trib Leon River WS SCS Site 11 Dam is owned by ERATH COUNTY;UPPER LEON SWCD (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Ne Trib Leon River WS SCS Site 11 Dam built?
Ne Trib Leon River WS SCS Site 11 Dam was completed in 1964, making it 62 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Ne Trib Leon River WS SCS Site 11 Dam?
Ne Trib Leon River WS SCS Site 11 Dam serves the following purposes: Flood Risk Reduction, Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Ne Trib Leon River WS SCS Site 11 Dam?
Ne Trib Leon River WS SCS Site 11 Dam has a dam height of 46 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.