Nanticoke Creek Site 7b Dam
Key Takeaway
Nanticoke Creek Site 7b Dam is classified as high hazard in New York. It was completed in 1970 and is 56 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 44 ft (taller than 90.2% in NY) |
| Dam Length | 830 ft |
| Dam Type | Earth |
| Max Storage | 1.0K acre-ft |
| Normal Storage | 384 acre-ft |
| Surface Area | 4 acres |
| Drainage Area | 4 sq mi |
| Max Discharge | 7,558 cfs |
| Year Completed | 1970 (56 years old) |
| NID ID | NY00605 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
BROOME COUNTY - BROOME COUNTY DEPARTMENT OF PARKS AND RECREATION
Local Government
Nearby Dams
Nanticoke Creek Site 8 Dam
Broome, NY
High Hazard 41 ftGreenwood Lake Park Dam
Broome, NY
Low Hazard 18 ftHarvey Pond Dam
Tioga, NY
Significant Hazard 22 ftNanticoke Creek Site 7a Dam
Broome, NY
High Hazard 67 ftNanticoke Creek Site 9e Dam
Broome, NY
High Hazard 42 ftTomsey Pond Dam
Tioga, NY
Low Hazard 18 ftNanticoke Creek Site 9a Dam
Broome, NY
High Hazard 37 ftNanticoke Creek Site 9c Dam
Broome, NY
High Hazard 33 ftFrequently Asked Questions
What is the hazard classification of Nanticoke Creek Site 7b Dam?
Nanticoke Creek Site 7b Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Nanticoke Creek Site 7b Dam?
Nanticoke Creek Site 7b Dam is owned by BROOME COUNTY - BROOME COUNTY DEPARTMENT OF PARKS AND RECREATION (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Nanticoke Creek Site 7b Dam built?
Nanticoke Creek Site 7b Dam was completed in 1970, making it 56 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Nanticoke Creek Site 7b Dam?
Nanticoke Creek Site 7b Dam serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Nanticoke Creek Site 7b Dam?
Nanticoke Creek Site 7b Dam has a dam height of 44 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Nanticoke Creek Site 7b Dam last inspected?
Nanticoke Creek Site 7b Dam was last inspected on August 31, 2020. Inspection dates indicate when a formal review occurred, not the results of that inspection.