Nanticoke Creek Site 3 Dam
Key Takeaway
Nanticoke Creek Site 3 Dam is classified as high hazard in New York. It was completed in 1970 and is 56 years old. Its primary use is recreation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 28 ft (taller than 75.9% in NY) |
| Dam Length | 515 ft |
| Dam Type | Earth |
| Max Storage | 437 acre-ft |
| Normal Storage | 340 acre-ft |
| Surface Area | 47 acres |
| Drainage Area | 1 sq mi |
| Max Discharge | 3,230 cfs |
| Year Completed | 1970 (56 years old) |
| NID ID | NY00612 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
NYS DEC DIVISION OF LANDS & FORESTS
State Government
Nearby Dams
Nanticoke Creek Site 9a Dam
Broome, NY
High Hazard 37 ftNanticoke Creek Site 9c Dam
Broome, NY
High Hazard 33 ftRaymond Nolan Pond Dam
Broome, NY
Low Hazard 12 ftGreenwood Lake Park Dam
Broome, NY
Low Hazard 18 ftTomsey Pond Dam
Tioga, NY
Low Hazard 18 ftViehweger Dam
Broome, NY
Low Hazard 8 ftNanticoke Creek Site 9e Dam
Broome, NY
High Hazard 42 ftHeukrath Wetland Dam
Broome, NY
Low Hazard 8 ftFrequently Asked Questions
What is the hazard classification of Nanticoke Creek Site 3 Dam?
Nanticoke Creek Site 3 Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Nanticoke Creek Site 3 Dam?
Nanticoke Creek Site 3 Dam is owned by NYS DEC DIVISION OF LANDS & FORESTS (State Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Nanticoke Creek Site 3 Dam built?
Nanticoke Creek Site 3 Dam was completed in 1970, making it 56 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Nanticoke Creek Site 3 Dam?
Nanticoke Creek Site 3 Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Nanticoke Creek Site 3 Dam?
Nanticoke Creek Site 3 Dam has a dam height of 28 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Nanticoke Creek Site 3 Dam last inspected?
Nanticoke Creek Site 3 Dam was last inspected on October 2, 2019. Inspection dates indicate when a formal review occurred, not the results of that inspection.