Nanticoke Creek Site 10 Dam
Key Takeaway
Nanticoke Creek Site 10 Dam is classified as high hazard in New York. It was completed in 1979 and is 47 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 58 ft (taller than 94.2% in NY) |
| Dam Length | 540 ft |
| Dam Type | Earth |
| Max Storage | 899 acre-ft |
| Normal Storage | 241 acre-ft |
| Surface Area | 20 acres |
| Drainage Area | 5 sq mi |
| Max Discharge | 11,546 cfs |
| Year Completed | 1979 (47 years old) |
| NID ID | NY00713 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
BROOME COUNTY - BROOME COUNTY DEPARTMENT OF PARKS AND RECREATION
Local Government
Nearby Dams
Robert Hodges Recreational Pond Dam
Broome, NY
Low Hazard 19 ftHeukrath Wetland Dam
Broome, NY
Low Hazard 8 ftNanticoke Creek Site 9e Dam
Broome, NY
High Hazard 42 ftRaymond Nolan Pond Dam
Broome, NY
Low Hazard 12 ftWhitney Point Dam
Broome, NY
High Hazard 95 ftNanticoke Creek Site 9c Dam
Broome, NY
High Hazard 33 ftNanticoke Creek Site 8 Dam
Broome, NY
High Hazard 41 ftGreenwood Lake Park Dam
Broome, NY
Low Hazard 18 ftFrequently Asked Questions
What is the hazard classification of Nanticoke Creek Site 10 Dam?
Nanticoke Creek Site 10 Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Nanticoke Creek Site 10 Dam?
Nanticoke Creek Site 10 Dam is owned by BROOME COUNTY - BROOME COUNTY DEPARTMENT OF PARKS AND RECREATION (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Nanticoke Creek Site 10 Dam built?
Nanticoke Creek Site 10 Dam was completed in 1979, making it 47 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Nanticoke Creek Site 10 Dam?
Nanticoke Creek Site 10 Dam serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Nanticoke Creek Site 10 Dam?
Nanticoke Creek Site 10 Dam has a dam height of 58 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Nanticoke Creek Site 10 Dam last inspected?
Nanticoke Creek Site 10 Dam was last inspected on October 2, 2019. Inspection dates indicate when a formal review occurred, not the results of that inspection.