Muir David
Key Takeaway
Muir David is classified as low hazard in Oklahoma. It was completed in 1984 and is 42 years old. Its primary use is other.
Physical Details
| Dam Height | 25 ft (taller than 29.9% in OK) |
| Dam Type | Earth |
| Max Storage | 50 acre-ft |
| Normal Storage | 25 acre-ft |
| Surface Area | 6 acres |
| Year Completed | 1984 (42 years old) |
| NID ID | OK21989 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
THELMA G MUIR
Private
Nearby Dams
Oknoname 103001
Noble, OK
Low Hazard 16 ftSCS-Upper Black Bear Creek Site-63
Noble, OK
Low Hazard 40 ftMeyer Pauline H.
Logan, OK
Low Hazard 26 ftSCS-Upper Black Bear Creek Site-62
Noble, OK
High Hazard 65 ftSCS-Upper Black Bear Creek Site-64
Noble, OK
Low Hazard 38 ftOknoname 30210
Payne, OK
Low Hazard 24 ftKemnitz George Jr
Noble, OK
Low Hazard 18 ftLee Mcmorries
Payne, OK
Low Hazard 27 ftFrequently Asked Questions
What is the hazard classification of Muir David?
Muir David is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Muir David?
Muir David is owned by THELMA G MUIR (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Muir David built?
Muir David was completed in 1984, making it 42 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Muir David?
Muir David serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Muir David?
Muir David has a dam height of 25 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Muir David last inspected?
Muir David was last inspected on December 14, 2010. Inspection dates indicate when a formal review occurred, not the results of that inspection.