Flint River

Flint· Dougherty, Georgia· Built 1921· Gravity· 60 ft tall
High Hazard Hydroelectric Public Utility

Key Takeaway

Flint River is classified as high hazard in Georgia. It was completed in 1921 and is 105 years old. Its primary use is hydroelectric. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.

Physical Details

Dam Height 60 ft (taller than 97.7% in GA)
Dam Length3,497 ft
Dam TypeGravity
Max Storage37.0K acre-ft
Normal Storage8.0K acre-ft
Surface Area1,400 acres
Drainage Area5,310 sq mi
Max Discharge52,000 cfs
Year Completed1921 (105 years old)
NID IDGA00835

Safety Information

High Hazard

Loss of human life is likely if the dam fails.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: Yes
Last Inspection: August 16, 2022
State Regulated: No

Ownership

Georgia Power Company

Public Utility

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Flint River?

Flint River is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Flint River?

Flint River is owned by Georgia Power Company (Public Utility). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Flint River built?

Flint River was completed in 1921, making it 105 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Flint River?

Flint River serves the following purposes: Hydroelectric. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Flint River?

Flint River has a dam height of 60 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Flint River last inspected?

Flint River was last inspected on August 16, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.