Ms05480 Lake Dam
Key Takeaway
Ms05480 Lake Dam is classified as low hazard in Mississippi. Its primary use is recreation.
Physical Details
| Dam Height | 21 ft (taller than 67.1% in MS) |
| Dam Type | Earth |
| Max Storage | 74 acre-ft |
| Normal Storage | 59 acre-ft |
| Surface Area | 5 acres |
| NID ID | MS05480 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Private
Nearby Dams
Lazy C Club Lake Dam
Hinds, MS
High Hazard 24 ftMs05477 Lake Dam
Hinds, MS
Low Hazard 15 ftWillowwood Subdivison Lake Dam
Hinds, MS
Unknown 15 ftSouth Clinton Sewage Lagoon Dam
Hinds, MS
Low Hazard 8 ftClinton Sewage Lagoon Dam
Hinds, MS
Low Hazard 8 ftMs05478 Lake Dam
Hinds, MS
Unknown 22 ftGreater Bethlehem Church Dam
Hinds, MS
Significant Hazard 16 ftDeviney Lake Dam
Hinds, MS
Low Hazard 20 ftFrequently Asked Questions
What is the hazard classification of Ms05480 Lake Dam?
Ms05480 Lake Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Ms05480 Lake Dam?
Ms05480 Lake Dam is owned by information not available (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Ms05480 Lake Dam?
Ms05480 Lake Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Ms05480 Lake Dam?
Ms05480 Lake Dam has a dam height of 21 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Ms05480 Lake Dam last inspected?
Ms05480 Lake Dam was last inspected on June 30, 2015. Inspection dates indicate when a formal review occurred, not the results of that inspection.