Ms05146 Lake Dam
Key Takeaway
Ms05146 Lake Dam is classified as low hazard in Mississippi. Its primary use is recreation.
Physical Details
| Dam Height | 17 ft (taller than 46.4% in MS) |
| Dam Type | Earth |
| Max Storage | 107 acre-ft |
| Normal Storage | 60 acre-ft |
| Surface Area | 9 acres |
| NID ID | MS05146 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Private
Nearby Dams
Southlakes Pond Dam
Grenada, MS
High Hazard 20 ftMs05144 Lake Dam
Grenada, MS
Unknown 13 ftMs06949 Lake Dam
Montgomery, MS
Unknown 16 ftMs05142 Lake Dam
Grenada, MS
Unknown 20 ftBogue Watershed Structure Y-30-108 Dam
Grenada, MS
Low Hazard 18 ftMs06948 Lake Dam
Montgomery, MS
Low Hazard 21 ftMs05147 Lake Dam
Carroll, MS
Low Hazard 18 ftMs06950 Lake Dam
Montgomery, MS
Low Hazard 18 ftFrequently Asked Questions
What is the hazard classification of Ms05146 Lake Dam?
Ms05146 Lake Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Ms05146 Lake Dam?
Ms05146 Lake Dam is owned by information not available (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Ms05146 Lake Dam?
Ms05146 Lake Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Ms05146 Lake Dam?
Ms05146 Lake Dam has a dam height of 17 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Ms05146 Lake Dam last inspected?
Ms05146 Lake Dam was last inspected on December 17, 2015. Inspection dates indicate when a formal review occurred, not the results of that inspection.