Ms04059 Lake Dam
Key Takeaway
Ms04059 Lake Dam is classified as low hazard in Mississippi. Its primary use is recreation.
Physical Details
| Dam Height | 11 ft (taller than 9.4% in MS) |
| Dam Type | Earth |
| Max Storage | 225 acre-ft |
| Normal Storage | 130 acre-ft |
| Surface Area | 31 acres |
| NID ID | MS04059 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Private
Nearby Dams
Ms04050 Lake Dam
Pearl River, MS
Low Hazard 16 ftMs04055 Lake Dam
Pearl River, MS
Low Hazard 7 ftMs04056 Lake Dam
Pearl River, MS
Unknown 14 ftMs04004 Lake Dam
Pearl River, MS
Low Hazard 10 ftStecil Smith Lake Dam
Pearl River, MS
Low Hazard 16 ftBilbo Lake Dam
Pearl River, MS
Low Hazard 15 ftMs04011 Lake Dam
Pearl River, MS
Low Hazard 16 ftMs04060 Lake Dam
Pearl River, MS
Low Hazard 10 ftFrequently Asked Questions
What is the hazard classification of Ms04059 Lake Dam?
Ms04059 Lake Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Ms04059 Lake Dam?
Ms04059 Lake Dam is owned by information not available (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Ms04059 Lake Dam?
Ms04059 Lake Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Ms04059 Lake Dam?
Ms04059 Lake Dam has a dam height of 11 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Ms04059 Lake Dam last inspected?
Ms04059 Lake Dam was last inspected on June 29, 2021. Inspection dates indicate when a formal review occurred, not the results of that inspection.