Mount Pleasant Fishing Lake Dam
Key Takeaway
Mount Pleasant Fishing Lake Dam is classified as significant hazard in North Carolina. It was completed in 1958 and is 68 years old. Its primary use is recreation. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Length | 350 ft |
| Dam Type | Earth |
| Max Storage | 146 acre-ft |
| Normal Storage | 36 acre-ft |
| Surface Area | 5 acres |
| Drainage Area | 324 sq mi |
| Max Discharge | 93 cfs |
| Year Completed | 1958 (68 years old) |
| NID ID | NC00105 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
NC Department of Transportation
State Government
Nearby Dams
Lake Houser Dam
Cleveland, NC
Significant HazardCliffside Active Ash Basin Downstream Dam
Cleveland, NC
High HazardCliffside Retention Basin Dam
Cleveland, NC
High HazardCliffside Active Ash Basin Upstream Dam
Cleveland, NC
High HazardCliffside Inactive Ash Basin #5 Saddle Dam
Rutherford, NC
High HazardCone Mills Dam
Rutherford, NC
Low HazardCliffside Inactive Ash Basin #5 Main Dam
Rutherford, NC
High HazardWhite and Beason Dam
Cleveland, NC
Low HazardFrequently Asked Questions
What is the hazard classification of Mount Pleasant Fishing Lake Dam?
Mount Pleasant Fishing Lake Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Mount Pleasant Fishing Lake Dam?
Mount Pleasant Fishing Lake Dam is owned by NC Department of Transportation (State Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Mount Pleasant Fishing Lake Dam built?
Mount Pleasant Fishing Lake Dam was completed in 1958, making it 68 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Mount Pleasant Fishing Lake Dam?
Mount Pleasant Fishing Lake Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Mount Pleasant Fishing Lake Dam last inspected?
Mount Pleasant Fishing Lake Dam was last inspected on October 28, 2020. Inspection dates indicate when a formal review occurred, not the results of that inspection.