Morris Veley Dam
Key Takeaway
Morris Veley Dam is classified as significant hazard in New York. It was completed in 1959 and is 67 years old. Its primary use is recreation. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 26 ft (taller than 73.4% in NY) |
| Dam Length | 330 ft |
| Dam Type | Earth |
| Max Storage | 51 acre-ft |
| Normal Storage | 51 acre-ft |
| Surface Area | 9 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 116 cfs |
| Year Completed | 1959 (67 years old) |
| NID ID | NY01087 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
TROUT HAVEN LAKE ASSOCIATION
Private
Nearby Dams
Rossman Fly Dam
Schoharie, NY
Low Hazard 7 ftMakely Pond Dam
Schoharie, NY
Significant Hazard 12 ftBear Gulch Pond Dam
Schoharie, NY
High Hazard 18 ftCobleskill Upper Reservoir Dam
Schoharie, NY
High Hazard 30 ftSummit Lake Dam
Schoharie, NY
Significant Hazard 14 ftVillage of Cobleskill Holding Pond Dam
Schoharie, NY
High Hazard 38 ftCobleskill Lower Res Dam
Schoharie, NY
High Hazard 20 ftSchuyler Lake Dam
Schoharie, NY
Significant Hazard 17 ftFrequently Asked Questions
What is the hazard classification of Morris Veley Dam?
Morris Veley Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Morris Veley Dam?
Morris Veley Dam is owned by TROUT HAVEN LAKE ASSOCIATION (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Morris Veley Dam built?
Morris Veley Dam was completed in 1959, making it 67 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Morris Veley Dam?
Morris Veley Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Morris Veley Dam?
Morris Veley Dam has a dam height of 26 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Morris Veley Dam last inspected?
Morris Veley Dam was last inspected on September 17, 2019. Inspection dates indicate when a formal review occurred, not the results of that inspection.