Mizell/Keller Pond Dam
Key Takeaway
Mizell/Keller Pond Dam is classified as low hazard in South Carolina. Its primary use is recreation.
Physical Details
| Dam Height | 30 ft (taller than 78.9% in SC) |
| Max Storage | 65 acre-ft |
| Normal Storage | 46 acre-ft |
| Surface Area | 6 acres |
| NID ID | SC02564 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
OLIVER W MIZZELL
Private
Nearby Dams
Hungerpillar Dam
Calhoun, SC
Unknown 15 ftPerkins Pond Dam
Calhoun, SC
Low Hazard 19 ftBickley Pond Dam
Calhoun, SC
Low Hazard 29 ftDorothy Rast Dam 1
Calhoun, SC
High Hazard 19 ftRichard Rast Dam
Calhoun, SC
Low Hazard 17 ftDorothy B Rast Pond Dam
Calhoun, SC
High Hazard 17 ftBill Campbell Pond Dam
Calhoun, SC
Low Hazard 15 ftR E Rast Pond Dam
Calhoun, SC
Low Hazard 19 ftFrequently Asked Questions
What is the hazard classification of Mizell/Keller Pond Dam?
Mizell/Keller Pond Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Mizell/Keller Pond Dam?
Mizell/Keller Pond Dam is owned by OLIVER W MIZZELL (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Mizell/Keller Pond Dam?
Mizell/Keller Pond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Mizell/Keller Pond Dam?
Mizell/Keller Pond Dam has a dam height of 30 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Mizell/Keller Pond Dam last inspected?
Mizell/Keller Pond Dam was last inspected on March 1, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.