Milton Sargent Dam

TR-TURKEY CREEK· Pawnee, Nebraska· Built 2002· Earth· 27 ft tall
Low Hazard Other Flood Risk Reduction Private

Key Takeaway

Milton Sargent Dam is classified as low hazard in Nebraska. It was completed in 2002 and is 24 years old. Its primary use is other.

Physical Details

Dam Height 27 ft (taller than 55% in NE)
Dam Length677 ft
Dam TypeEarth
Max Storage123 acre-ft
Normal Storage33 acre-ft
Surface Area7 acres
Drainage Area1 sq mi
Max Discharge45 cfs
Year Completed2002 (24 years old)
NID IDNE02687

Safety Information

Low Hazard

No probable loss of human life and low economic/environmental losses expected.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: No
Last Inspection: May 12, 2021
State Regulated: Yes
Regulatory Agency: NE DNR

Ownership

Milton J & Marcia Sargent

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Milton Sargent Dam?

Milton Sargent Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Milton Sargent Dam?

Milton Sargent Dam is owned by Milton J & Marcia Sargent (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Milton Sargent Dam built?

Milton Sargent Dam was completed in 2002, making it 24 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Milton Sargent Dam?

Milton Sargent Dam serves the following purposes: Other, Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Milton Sargent Dam?

Milton Sargent Dam has a dam height of 27 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Milton Sargent Dam last inspected?

Milton Sargent Dam was last inspected on May 12, 2021. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.