Millark Millpond Dam
Key Takeaway
Millark Millpond Dam is classified as significant hazard in Indiana. It was completed in 1940 and is 86 years old. Its primary use is recreation. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 12 ft (taller than 4.9% in IN) |
| Dam Length | 370 ft |
| Dam Type | Concrete |
| Max Storage | 159 acre-ft |
| Normal Storage | 35 acre-ft |
| Surface Area | 7 acres |
| Drainage Area | 18 sq mi |
| Max Discharge | 1,286 cfs |
| Year Completed | 1940 (86 years old) |
| NID ID | IN00775 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
GREGORY FOSTER
Private
Nearby Dams
Frequently Asked Questions
What is the hazard classification of Millark Millpond Dam?
Millark Millpond Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Millark Millpond Dam?
Millark Millpond Dam is owned by GREGORY FOSTER (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Millark Millpond Dam built?
Millark Millpond Dam was completed in 1940, making it 86 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Millark Millpond Dam?
Millark Millpond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Millark Millpond Dam?
Millark Millpond Dam has a dam height of 12 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Millark Millpond Dam last inspected?
Millark Millpond Dam was last inspected on January 22, 2020. Inspection dates indicate when a formal review occurred, not the results of that inspection.