Mill Service No 5

TR SEWICKLEY CREEK· Westmoreland, Pennsylvania· Built 1976· Earth· 75 ft tall
Low Hazard Other Private

Key Takeaway

Mill Service No 5 is classified as low hazard in Pennsylvania. It was completed in 1976 and is 50 years old. Its primary use is other.

Physical Details

Dam Height 75 ft (taller than 92.2% in PA)
Dam Length3,050 ft
Dam TypeEarth
Max Storage402 acre-ft
Normal Storage166 acre-ft
Surface Area11 acres
Drainage Area0 sq mi
Year Completed1976 (50 years old)
NID IDPA01451

Safety Information

Low Hazard

No probable loss of human life and low economic/environmental losses expected.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: No
Last Inspection: July 23, 2018
State Regulated: Yes
Regulatory Agency: Pennsylvania Department of Environmental Protection

Ownership

MAX ENVIRONMENTAL TECHNOLOGIES, INC.

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Mill Service No 5?

Mill Service No 5 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Mill Service No 5?

Mill Service No 5 is owned by MAX ENVIRONMENTAL TECHNOLOGIES, INC. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Mill Service No 5 built?

Mill Service No 5 was completed in 1976, making it 50 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Mill Service No 5?

Mill Service No 5 serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Mill Service No 5?

Mill Service No 5 has a dam height of 75 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Mill Service No 5 last inspected?

Mill Service No 5 was last inspected on July 23, 2018. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.