Key Takeaway
Middle Oconee- Walnut Creek Structure No 9 is classified as low hazard in Georgia. It was completed in 1972 and is 54 years old. Its primary use is flood risk reduction.
Physical Details
| Dam Height | 46 ft (taller than 94.9% in GA) |
| Dam Length | 540 ft |
| Dam Type | Earth |
| Max Storage | 448 acre-ft |
| Surface Area | 9 acres |
| Drainage Area | 1,107 sq mi |
| Year Completed | 1972 (54 years old) |
| NID ID | GA00538 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Upper Chattahoochee River S & Wcd
State Government
Nearby Dams
Alpha Iii Lake Dam
Jackson, GA
Low Hazard 32 ftBerry Lake Dam
Hall, GA
Low Hazard 22 ftTara Lake Dam
Hall, GA
Low Hazard 37 ftMiddle Oconee-Walnut Creek WS Structure # 12
Jackson, GA
Low Hazard 36 ftGainesville Stone Lake Dam
Hall, GA
Low Hazard 40 ftMiddle Oconee-Walnut Creek WS Structure # 6
Jackson, GA
Low Hazard 31 ftDicker Lake Dam
Jackson, GA
Low Hazard 31 ftMiddle Oconee- Walnut Creek Structure No 7
Hall, GA
Low Hazard 47 ftFrequently Asked Questions
What is the hazard classification of Middle Oconee- Walnut Creek Structure No 9?
Middle Oconee- Walnut Creek Structure No 9 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Middle Oconee- Walnut Creek Structure No 9?
Middle Oconee- Walnut Creek Structure No 9 is owned by Upper Chattahoochee River S & Wcd (State Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Middle Oconee- Walnut Creek Structure No 9 built?
Middle Oconee- Walnut Creek Structure No 9 was completed in 1972, making it 54 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Middle Oconee- Walnut Creek Structure No 9?
Middle Oconee- Walnut Creek Structure No 9 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Middle Oconee- Walnut Creek Structure No 9?
Middle Oconee- Walnut Creek Structure No 9 has a dam height of 46 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Middle Oconee- Walnut Creek Structure No 9 last inspected?
Middle Oconee- Walnut Creek Structure No 9 was last inspected on October 1, 2009. Inspection dates indicate when a formal review occurred, not the results of that inspection.