Meng Dam

TR-LONG BRANCH CREEK· Sioux, Nebraska· Built 1936· Earth· 19 ft tall
Low Hazard Fire Protection Stock Or Small Fish Pond Federal Government

Key Takeaway

Meng Dam is classified as low hazard in Nebraska. It was completed in 1936 and is 90 years old. Its primary use is fire protection.

Physical Details

Dam Height 19 ft (taller than 24.6% in NE)
Dam Length1,850 ft
Dam TypeEarth
Max Storage350 acre-ft
Normal Storage207 acre-ft
Surface Area39 acres
Drainage Area3 sq mi
Max Discharge0 cfs
Year Completed1936 (90 years old)
NID IDNE01392

Safety Information

Low Hazard

No probable loss of human life and low economic/environmental losses expected.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: No
Last Inspection: August 6, 2019
State Regulated: Yes
Regulatory Agency: NE DNR

Ownership

United Ss Forest Service

Federal Government

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Meng Dam?

Meng Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Meng Dam?

Meng Dam is owned by United Ss Forest Service (Federal Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Meng Dam built?

Meng Dam was completed in 1936, making it 90 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Meng Dam?

Meng Dam serves the following purposes: Fire Protection, Stock, Or Small Fish Pond. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Meng Dam?

Meng Dam has a dam height of 19 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Meng Dam last inspected?

Meng Dam was last inspected on August 6, 2019. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.