Melody Lake Dam

TR-WILLET CREEK· Cortland, New York· Built 1902· Stone· 26 ft tall
High Hazard Recreation Private

Key Takeaway

Melody Lake Dam is classified as high hazard in New York. It was completed in 1902 and is 124 years old. Its primary use is recreation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.

Physical Details

Dam Height 26 ft (taller than 73.4% in NY)
Dam Length120 ft
Dam TypeStone
Max Storage620 acre-ft
Normal Storage410 acre-ft
Surface Area44 acres
Drainage Area2 sq mi
Max Discharge1,607 cfs
Year Completed1902 (124 years old)
NID IDNY00748

Safety Information

High Hazard

Loss of human life is likely if the dam fails.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: Yes
Last Inspection: August 31, 2020
State Regulated: Yes
Regulatory Agency: NYS DEC

Ownership

MELODY LAKE ASSOCIATION

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Melody Lake Dam?

Melody Lake Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Melody Lake Dam?

Melody Lake Dam is owned by MELODY LAKE ASSOCIATION (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Melody Lake Dam built?

Melody Lake Dam was completed in 1902, making it 124 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Melody Lake Dam?

Melody Lake Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Melody Lake Dam?

Melody Lake Dam has a dam height of 26 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Melody Lake Dam last inspected?

Melody Lake Dam was last inspected on August 31, 2020. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.