Mcgrady Dam
Key Takeaway
Mcgrady Dam is classified as high hazard in South Carolina. Its primary use is recreation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 10 ft (taller than 5.2% in SC) |
| Max Storage | 758 acre-ft |
| Normal Storage | 207 acre-ft |
| Surface Area | 64 acres |
| NID ID | SC03564 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
EDITH JOANN ACKERMAN
Private
Nearby Dams
Crosbys Pond Dam
Colleton, SC
Unknown 10 ftBig Survey Lake Dam
Colleton, SC
Low Hazard 24 ftWestglow Haven Lake Dam
Colleton, SC
Low Hazard 14 ftBennetts Pond Dam
Colleton, SC
Low Hazard 11 ftL G Fishbourne Dam 1
Colleton, SC
Low Hazard 10 ftL G Fishbourne Dam 2
Colleton, SC
Low Hazard 9 ftFishbourne Reserv Dam
Colleton, SC
Low Hazard 7 ftLila Mae Mixon Dam
Hampton, SC
Low Hazard 15 ftFrequently Asked Questions
What is the hazard classification of Mcgrady Dam?
Mcgrady Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Mcgrady Dam?
Mcgrady Dam is owned by EDITH JOANN ACKERMAN (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Mcgrady Dam?
Mcgrady Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Mcgrady Dam?
Mcgrady Dam has a dam height of 10 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Mcgrady Dam last inspected?
Mcgrady Dam was last inspected on March 8, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.