Mcelroy Lake Dam
Key Takeaway
Mcelroy Lake Dam is classified as low hazard in Georgia. Its primary use is recreation.
Physical Details
| Dam Height | 26 ft (taller than 62.1% in GA) |
| Dam Length | 420 ft |
| Dam Type | Earth |
| Max Storage | 148 acre-ft |
| Normal Storage | 80 acre-ft |
| Surface Area | 10 acres |
| NID ID | GA05446 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Mcelroy, Perry D.
Private
Nearby Dams
Blalock Reservoir Dam
Henry, GA
High Hazard 39 ftHarbin Lake Dam
Henry, GA
Low Hazard 18 ftCounty Line Lake Dam
Henry, GA
Low Hazard 32 ftShoreline Way Lake Dam
Henry, GA
Low Hazard 30 ftCook Lake Dam
Henry, GA
High Hazard 37 ftWeems Lake Dam
Henry, GA
High Hazard 28 ftLake Erma Dam
Henry, GA
Low Hazard 37 ftRum Ridge Lake Dam
Henry, GA
Low Hazard 13 ftFrequently Asked Questions
What is the hazard classification of Mcelroy Lake Dam?
Mcelroy Lake Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Mcelroy Lake Dam?
Mcelroy Lake Dam is owned by Mcelroy, Perry D. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Mcelroy Lake Dam?
Mcelroy Lake Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Mcelroy Lake Dam?
Mcelroy Lake Dam has a dam height of 26 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Mcelroy Lake Dam last inspected?
Mcelroy Lake Dam was last inspected on March 1, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.