Mcdaniel Lake Dam
Key Takeaway
Mcdaniel Lake Dam is classified as low hazard in Georgia. Its primary use is recreation.
Physical Details
| Dam Height | 30 ft (taller than 76% in GA) |
| Dam Length | 280 ft |
| Dam Type | Earth |
| Max Storage | 66 acre-ft |
| Normal Storage | 51 acre-ft |
| Surface Area | 5 acres |
| Drainage Area | 57 sq mi |
| NID ID | GA04616 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
George Mize Jr.
Private
Nearby Dams
Illges Pond Dam
Harris, GA
Low Hazard 23 ftWeathers Dam
Harris, GA
Low Hazard 27 ftHorton Lake Dam
Harris, GA
Low Hazard 28 ftConcharty Lake Dam
Harris, GA
High Hazard 34 ftLake Milt-Ann Dam
Harris, GA
Low Hazard 31 ftLake Franklin Dam
Harris, GA
High Hazard 48 ftOak Mountain Lake Dam
Talbot, GA
Low Hazard 22 ftFavors Dam
Harris, GA
Low Hazard 25 ftFrequently Asked Questions
What is the hazard classification of Mcdaniel Lake Dam?
Mcdaniel Lake Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Mcdaniel Lake Dam?
Mcdaniel Lake Dam is owned by George Mize Jr. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Mcdaniel Lake Dam?
Mcdaniel Lake Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Mcdaniel Lake Dam?
Mcdaniel Lake Dam has a dam height of 30 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Mcdaniel Lake Dam last inspected?
Mcdaniel Lake Dam was last inspected on March 24, 2020. Inspection dates indicate when a formal review occurred, not the results of that inspection.