Martinez Creek WS SCS Site 6a Dam
Key Takeaway
Martinez Creek WS SCS Site 6a Dam is classified as high hazard in Texas. It was completed in 1966 and is 60 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 36 ft (taller than 79.5% in TX) |
| Dam Length | 1,552 ft |
| Dam Type | Earth |
| Max Storage | 6.9K acre-ft |
| Normal Storage | 74 acre-ft |
| Surface Area | 53 acres |
| Drainage Area | 17 sq mi |
| Max Discharge | 50,896 cfs |
| Year Completed | 1966 (60 years old) |
| NID ID | TX01464 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
ALAMO SWCD;SAN ANTONIO RIVER AUTHORITY
Local Government
Nearby Dams
Martinez Creek WS SCS Site 3 Dam
Bexar, TX
High Hazard 37 ftMartinez Creek WS SCS Site 1 Dam
Bexar, TX
High Hazard 43 ftMartinez Creek WS SCS Site 2 Dam
Bexar, TX
High Hazard 33 ftMartinez Creek WS SCS Site 4 Dam
Bexar, TX
High Hazard 36 ftArmy Residence Community Dam
Bexar, TX
High Hazard 14 ftMartinez Creek WS SCS Site 5 Dam
Bexar, TX
High Hazard 40 ftCalaveras Creek WS SCS Site 7 Dam
Bexar, TX
High Hazard 35 ftCalaveras Creek WS SCS Site 6 Dam
Bexar, TX
High Hazard 43 ftFrequently Asked Questions
What is the hazard classification of Martinez Creek WS SCS Site 6a Dam?
Martinez Creek WS SCS Site 6a Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Martinez Creek WS SCS Site 6a Dam?
Martinez Creek WS SCS Site 6a Dam is owned by ALAMO SWCD;SAN ANTONIO RIVER AUTHORITY (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Martinez Creek WS SCS Site 6a Dam built?
Martinez Creek WS SCS Site 6a Dam was completed in 1966, making it 60 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Martinez Creek WS SCS Site 6a Dam?
Martinez Creek WS SCS Site 6a Dam serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Martinez Creek WS SCS Site 6a Dam?
Martinez Creek WS SCS Site 6a Dam has a dam height of 36 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Martinez Creek WS SCS Site 6a Dam last inspected?
Martinez Creek WS SCS Site 6a Dam was last inspected on April 13, 2021. Inspection dates indicate when a formal review occurred, not the results of that inspection.