Maricopa Road Basin

UNKNOWN· Pinal, Arizona· Built 1995· Earth· 8 ft tall

Key Takeaway

Maricopa Road Basin is classified as high hazard in Arizona. It was completed in 1995 and is 31 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.

Physical Details

Dam Height 8 ft (taller than 2% in AZ)
Dam Length4,202 ft
Dam TypeEarth
Normal Storage123 acre-ft
Surface Area25 acres
Year Completed1995 (31 years old)
NID IDAZ00343

Safety Information

High Hazard

Loss of human life is likely if the dam fails.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: Yes
Last Inspection: February 25, 2021
State Regulated: Yes
Regulatory Agency: ARIZONA DEPARTMENT OF WATER RESOURCES

Ownership

PINAL COUNTY

Local Government

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Maricopa Road Basin?

Maricopa Road Basin is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Maricopa Road Basin?

Maricopa Road Basin is owned by PINAL COUNTY (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Maricopa Road Basin built?

Maricopa Road Basin was completed in 1995, making it 31 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Maricopa Road Basin?

Maricopa Road Basin serves the following purposes: Flood Risk Reduction, Fire Protection, Stock, Or Small Fish Pond. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Maricopa Road Basin?

Maricopa Road Basin has a dam height of 8 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Maricopa Road Basin last inspected?

Maricopa Road Basin was last inspected on February 25, 2021. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.