Mac Lake Dam
Key Takeaway
Mac Lake Dam is classified as low hazard in Georgia. Its primary use is recreation.
Physical Details
| Dam Height | 27 ft (taller than 65.9% in GA) |
| Dam Length | 300 ft |
| Dam Type | Earth |
| Max Storage | 162 acre-ft |
| Normal Storage | 108 acre-ft |
| Surface Area | 12 acres |
| Max Discharge | 162 cfs |
| NID ID | GA04212 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Bee Gap Homeowners Association
Private
Nearby Dams
Ronald Moore Lake Dam
Dade, GA
Low Hazard 23 ftPreserve At Rising Fawn #1 Dam
Dade, GA
Unknown 40 ftWallin Pond Lake Dam
Dade, GA
Low Hazard 41 ftJohnson Lake Dam
Dade, GA
Low Hazard 35 ftLookout Lake Dam
Dade, GA
Low Hazard 20 ftEllen's Mud Hole Lake Dam
Dade, GA
Low Hazard 23 ftGross Lake Dam
Dade, GA
Low Hazard 29 ftMoore Lake Dam
Dade, GA
Low Hazard 27 ftFrequently Asked Questions
What is the hazard classification of Mac Lake Dam?
Mac Lake Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Mac Lake Dam?
Mac Lake Dam is owned by Bee Gap Homeowners Association (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Mac Lake Dam?
Mac Lake Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Mac Lake Dam?
Mac Lake Dam has a dam height of 27 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Mac Lake Dam last inspected?
Mac Lake Dam was last inspected on December 21, 2016. Inspection dates indicate when a formal review occurred, not the results of that inspection.