M J Simmons Pond Dam
Key Takeaway
M J Simmons Pond Dam is classified as low hazard in Mississippi. Its primary use is recreation.
Physical Details
| Dam Height | 15 ft (taller than 30.5% in MS) |
| Dam Type | Earth |
| Max Storage | 64 acre-ft |
| NID ID | MS01560 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
CARLSON BLAIR
Private
Nearby Dams
Hilderbrant Lake Dam
DeSoto, MS
High Hazard 10 ftBanks Land and Cattle Company Dam
DeSoto, MS
Unknown 14 ftN B Gray Pond Dam
DeSoto, MS
Low Hazard 15 ftR E Selph Pond Number 2 Dam
DeSoto, MS
Low Hazard 18 ftR E Selph Pond Dam
DeSoto, MS
Low Hazard 18 ftCross Creek Dam - West Lake Dam
DeSoto, MS
High Hazard 19 ftCross Creek Dam - East Lake Dam
DeSoto, MS
High Hazard 13 ftT Caffey Robertson Pond Dam
DeSoto, MS
Low Hazard 20 ftFrequently Asked Questions
What is the hazard classification of M J Simmons Pond Dam?
M J Simmons Pond Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates M J Simmons Pond Dam?
M J Simmons Pond Dam is owned by CARLSON BLAIR (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of M J Simmons Pond Dam?
M J Simmons Pond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is M J Simmons Pond Dam?
M J Simmons Pond Dam has a dam height of 15 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was M J Simmons Pond Dam last inspected?
M J Simmons Pond Dam was last inspected on May 19, 2014. Inspection dates indicate when a formal review occurred, not the results of that inspection.