M-10 and M-11 Tanks Impound Dam
Key Takeaway
M-10 and M-11 Tanks Impound Dam is classified as low hazard in Georgia.
Physical Details
| Dam Height | 52 ft (taller than 96.4% in GA) |
| Dam Length | 950 ft |
| Dam Type | Earth |
| Max Storage | 890 acre-ft |
| Normal Storage | 625 acre-ft |
| Surface Area | 32 acres |
| Drainage Area | 0 sq mi |
| NID ID | GA06961 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
IMERYS CLAY, INC.
Private
Nearby Dams
Stinson Impound Fish Pond Dam
Wilkinson, GA
Low Hazard 27 ftGordon Plant
Wilkinson, GA
Significant Hazard 85 ftEngelhard Kaolin Tailings Pond Dam
Wilkinson, GA
Low Hazard 44 ftHuber Clear Creek Impound Dam
Wilkinson, GA
Low Hazard 33 ftGriffin Waste Impound Dam
Twiggs, GA
Low Hazard 28 ftEngelhard Technical Center Dam
Wilkinson, GA
Low Hazard 20 ftLake Tchukolaho Dam
Wilkinson, GA
Low Hazard 16 ftIra Holliman Tailings Impoundment Dam
Wilkinson, GA
High Hazard 87 ftFrequently Asked Questions
What is the hazard classification of M-10 and M-11 Tanks Impound Dam?
M-10 and M-11 Tanks Impound Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates M-10 and M-11 Tanks Impound Dam?
M-10 and M-11 Tanks Impound Dam is owned by IMERYS CLAY, INC. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
How tall is M-10 and M-11 Tanks Impound Dam?
M-10 and M-11 Tanks Impound Dam has a dam height of 52 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was M-10 and M-11 Tanks Impound Dam last inspected?
M-10 and M-11 Tanks Impound Dam was last inspected on January 1, 2018. Inspection dates indicate when a formal review occurred, not the results of that inspection.