Lovell Reservoir No 1 Levee

NORTH FK LONG ISLAND BAYOU· Liberty, Texas· Built 1955· Earth· 9 ft tall
Low Hazard Irrigation Private

Key Takeaway

Lovell Reservoir No 1 Levee is classified as low hazard in Texas. It was completed in 1955 and is 71 years old. Its primary use is irrigation.

Physical Details

Dam Height 9 ft (taller than 2.7% in TX)
Dam Length3,800 ft
Dam TypeEarth
Max Storage179 acre-ft
Normal Storage140 acre-ft
Surface Area21 acres
Drainage Area0 sq mi
Year Completed1955 (71 years old)
NID IDTX04333

Safety Information

Low Hazard

No probable loss of human life and low economic/environmental losses expected.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: No
Last Inspection: March 8, 1979
State Regulated: No

Ownership

LOVELL JOHN I AND BROWN A REESE

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Lovell Reservoir No 1 Levee?

Lovell Reservoir No 1 Levee is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Lovell Reservoir No 1 Levee?

Lovell Reservoir No 1 Levee is owned by LOVELL JOHN I AND BROWN A REESE (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Lovell Reservoir No 1 Levee built?

Lovell Reservoir No 1 Levee was completed in 1955, making it 71 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Lovell Reservoir No 1 Levee?

Lovell Reservoir No 1 Levee serves the following purposes: Irrigation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Lovell Reservoir No 1 Levee?

Lovell Reservoir No 1 Levee has a dam height of 9 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Lovell Reservoir No 1 Levee last inspected?

Lovell Reservoir No 1 Levee was last inspected on March 8, 1979. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.