Lithium Lagoon B Dam
Key Takeaway
Lithium Lagoon B Dam is classified as significant hazard in North Carolina. Its primary use is other. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Length | 450 ft |
| Dam Type | Earth |
| Max Storage | 0 acre-ft |
| Normal Storage | 0 acre-ft |
| Surface Area | 0 acres |
| NID ID | NC02640 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Martin Marietta Materials, Inc.
Private
Nearby Dams
Lithium Lagoon D Dam
Gaston, NC
Significant HazardLithium Lagoon A Dam
Gaston, NC
Significant HazardMartin-Marietta Quarry Dam
Gaston, NC
Significant HazardLithco Mine Tailings Dam F
Gaston, NC
High HazardS.C. Lovelace Dam
Gaston, NC
Significant HazardBen Webber Lake Dam
Gaston, NC
High HazardArrowood Lake Dam
Gaston, NC
High HazardBeam Lake Dam
Gaston, NC
Low HazardFrequently Asked Questions
What is the hazard classification of Lithium Lagoon B Dam?
Lithium Lagoon B Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Lithium Lagoon B Dam?
Lithium Lagoon B Dam is owned by Martin Marietta Materials, Inc. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Lithium Lagoon B Dam?
Lithium Lagoon B Dam serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Lithium Lagoon B Dam last inspected?
Lithium Lagoon B Dam was last inspected on May 14, 2019. Inspection dates indicate when a formal review occurred, not the results of that inspection.