Lee Nuclear Dam 4
Key Takeaway
Lee Nuclear Dam 4 is classified as low hazard in South Carolina. Its primary use is other.
Physical Details
| Dam Height | 65 ft (taller than 98.5% in SC) |
| Max Storage | 3.0K acre-ft |
| Normal Storage | 2.1K acre-ft |
| Surface Area | 85 acres |
| NID ID | SC02834 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
DUKE ENERGY
Private
Nearby Dams
Ninety Nine Islands
Cherokee, SC
High Hazard 72 ftLee Nuclear Dam 3
Cherokee, SC
Low Hazard 27 ftLee Nuclear Dam 2
Cherokee, SC
Low Hazard 34 ftLee Nuclear Dam 1
Cherokee, SC
Low Hazard 79 ftCherokee Falls
Cherokee, SC
Significant Hazard 16 ftLarry Sossaman Dam 2
Cherokee, SC
Low Hazard 26 ftLarry Sossaman Dam 1
Cherokee, SC
Low Hazard 25 ftMattox Pond Dam
Cherokee, SC
Low Hazard 34 ftFrequently Asked Questions
What is the hazard classification of Lee Nuclear Dam 4?
Lee Nuclear Dam 4 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Lee Nuclear Dam 4?
Lee Nuclear Dam 4 is owned by DUKE ENERGY (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Lee Nuclear Dam 4?
Lee Nuclear Dam 4 serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Lee Nuclear Dam 4?
Lee Nuclear Dam 4 has a dam height of 65 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Lee Nuclear Dam 4 last inspected?
Lee Nuclear Dam 4 was last inspected on August 31, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.