Lawrence Ledford Dam

TR-PETERS CREEK· Pickens, South Carolina· Built 1968· 25 ft tall
High Hazard Recreation Private

Key Takeaway

Lawrence Ledford Dam is classified as high hazard in South Carolina. It was completed in 1968 and is 58 years old. Its primary use is recreation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.

Physical Details

Dam Height 25 ft (taller than 62.5% in SC)
Max Storage75 acre-ft
Normal Storage47 acre-ft
Surface Area7 acres
Year Completed1968 (58 years old)
NID IDSC00711

Safety Information

High Hazard

Loss of human life is likely if the dam fails.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: No
Last Inspection: June 14, 2021
State Regulated: Yes
Regulatory Agency: SC DHEC

Ownership

LAWRENCE AND MAXINE LEDFORD

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Lawrence Ledford Dam?

Lawrence Ledford Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Lawrence Ledford Dam?

Lawrence Ledford Dam is owned by LAWRENCE AND MAXINE LEDFORD (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Lawrence Ledford Dam built?

Lawrence Ledford Dam was completed in 1968, making it 58 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Lawrence Ledford Dam?

Lawrence Ledford Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Lawrence Ledford Dam?

Lawrence Ledford Dam has a dam height of 25 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Lawrence Ledford Dam last inspected?

Lawrence Ledford Dam was last inspected on June 14, 2021. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.