Lawrence Dam
Key Takeaway
Lawrence Dam is classified as low hazard in Virginia. Its primary use is recreation.
Physical Details
| Dam Height | 19 ft (taller than 24.5% in VA) |
| Dam Length | 210 ft |
| Dam Type | Earth |
| Max Storage | 70 acre-ft |
| Normal Storage | 22 acre-ft |
| Surface Area | 5 acres |
| Drainage Area | 1 sq mi |
| NID ID | VA107033 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Martin Lawrence Family Trust
Private
Nearby Dams
Haynes Dam
Loudoun, VA
Significant Hazard 41 ftBirch Street Johnson Dam
Loudoun, VA
Unknown 26 ftCreekspring Court Dam
Loudoun, VA
Unknown 23 ftWatermill Road Dam
Loudoun, VA
Unknown 23 ftWhite Goose Lane Dam
Loudoun, VA
Unknown 25 ftOliver Dam
Loudoun, VA
Significant Hazard 44 ftLoudoun Golf & Country Club Dam
Loudoun, VA
Unknown 20 ftKingsley Dam
Loudoun, VA
Unknown 44 ftFrequently Asked Questions
What is the hazard classification of Lawrence Dam?
Lawrence Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Lawrence Dam?
Lawrence Dam is owned by Martin Lawrence Family Trust (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Lawrence Dam?
Lawrence Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Lawrence Dam?
Lawrence Dam has a dam height of 19 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Lawrence Dam last inspected?
Lawrence Dam was last inspected on June 25, 2020. Inspection dates indicate when a formal review occurred, not the results of that inspection.